Puraflo Peat System & E-Z Flow Product
- A Challenging Lot to Work With
- Bed Preparation
- Preparation of Bed, E-Z Flow Installation
- Disassembling Peat Module
- Removal of Peat from Module
- Peat Matter Removed from Module
- Installation of Peat Module Atop E-Z Flow Bed
- Re-Assembly of Peat Module
- Finished Bed
- Meeting with Hall Co. Environmental Health Inspector